It is noted that the first batch of LNG was delivered to a new terminal operated by the company, located in Wilhelmshaven.

It is also reported that the Maria Energy ship was loaded with gas in the US on December 19.

About 170 thousand cubic meters were loaded onto the ship.

m LNG.

The report says that this is enough to provide energy for about 50 thousand households in Germany during the year.

Earlier it was reported that the UK completely stopped importing Russian LNG from January 1.