• Two car parks of the future for the new Bernabéu

  • The installation of the futuristic roof of the new stadium begins

Less traffic, parking lots and a more comfortable environment on match days or events at the

Santiago Bernabéu

.

The City Council has dealt with the claims of the residents of the Madrid stadium area and the

by-pass

project that will link the

Paseo de la Habana with Padre Damián

, passing under the Plaza de los

Sagrados Corazones

, has been improved.

In the coming days, the mobility department, directed by

Borja Carabante

, will present the new plan, where the four lanes on the surface are maintained, two in each direction, the same ones that the street that goes up from the Castellana looks like right now.

Access to the tunnel has been redesigned so that no lane is lost and the entrance to the subway fits in as harmoniously as possible with the environment (sidewalks and zebra crossings), another of the requests from residents, who until on the railings of the construction have expressed their opinion.

It will be less bulky than in your initial sketch.

The neighborhood and the merchants, punished in recent years by the colossal work of the Bernabéu and sensitive to more reforms, expressed their reluctance after learning that the cranes would continue in the surroundings.

Recreation of the entrance to the by-pass that will link Paseo de la Habana with Padre Damián and will give access to the new BernabéuEM car parks

The consistory directed by

José Luis Martínez-Almeida

has listened to their requests and thrown pedagogy.

“We have improved the project.

The same surface parking spaces are maintained and two new car parks are gained”, sums up Carabante, delegate for the environment and mobility of the City Council of the capital.

He is referring to the two public super car parks that will cause this change between Paseo de la Habana and Padre Damián, with a total capacity of 1,846 spaces, of which 617 will be for residents.

Your monthly fee will not exceed 125 euros.

You will enter the car park through the Paseo de la Habana by-pass, just before coming to the Plaza de los Sagrados Corazones, famous for being the meeting point for the Madrid fans to receive the bus of the players on the great European nights .

Right there, the underground access will appear, in the form of two lanes, which will allow both the entrance to the car parks and driving towards Padre Damián, leaving at the end of the street, near the Eurobuilding.

The new 'kiss&ride' area next to the Padre Damián schools. WORLD

In this way, the traffic passing through to Alberto Alcocer will be able to circulate underground and the local traffic or the one that goes to the school centers of the street will go on the surface.

Precisely, to avoid the congestion that now occurs at the doors of the schools, with double and even triple lines of parents, a kiss&ride lane will be opened to drop off and pick up students in an orderly and safe manner.

Distribution by floors of the future Bernabéu car parks.EM

"The by-pass is not going to attract more cars," says Carabante, regarding another of the neighborhood fears.

«Our studies tell us that the movement up and down the city is through the Castellana.

And in fact, with this project traffic will be reduced by 25% in Sagrados Corazones”, says the mobility delegate.

In addition, on the days of the event, residents will be able to use the by-pass to reach their homes, without suffering the cuts in the area that now occur.

"On those days, residents will be able to travel, not like up to now," Carabante stresses.

The by-pass and the car parks will be joined by the construction of the new Santiago Bernabéu Metro station that GRAN MADRID carried out exclusively and which will replace the current old one.

It will double its capacity and will be 100% accessible, with 24 stairs and 12 elevators.

The future Father Damien, next to the Church of the Sacred Hearts.EM

The bidding process is about to end, the project will be assigned (Real Madrid is one of the applicants for its realization) so that the works begin next spring with the aim of having the car parks ready for use by the end of 2024 Before, in December 2023, the white club intends to hold the grand opening of its new stadium, which is just now accelerating the final phase of its reform, taking advantage of the fact that the team does not have games because of the World Cup in Qatar.

The 12 huge retractable roof beams are being installed and the stainless steel skin is growing every day.

According to the criteria of The Trust Project

Know more