- We expect to open to the public this spring, says Johan Larsson, project manager for the swimming pool.

The new modern swimming hall will have a total surface area of ​​21,732 square meters.

- It's only when you enter the changing rooms that you understand how big the swimming pool is, says Johan Larsson, project manager for the swimming pool, referring to all the more than 1,000 lockers that will be filled by visitors.

Equally shared sports hall and adventure pool

In the old swimming pool, the area was divided between sports, adventure and relaxation.

This will also be the case in the new one, which will include three water slides, a wave pool and flowing canals.

Sports such as underwater polo and water polo will be able to be played at the same time as you can climb the climbing wall and practice jumping in the diving pool, says Johan Larsson.

Join project manager Johan Larsson for a sneak peek inside the new swimming pool in the clip above.