China News Service, August 3. According to the website of the Ministry of Emergency Management, at present, the main stream of the Liaohe River continues to exceed the alarm, and the tributary of the Raoyang River embankment breach has not been completely blocked.

According to meteorological forecasts, in the next ten days, the northeastern region will still be one of the main rainfall areas in my country. The rainfall in some areas such as western Liaoning will reach 100 mm to 150 mm, and the local rainfall will exceed 200 mm.

On August 3, the General Office of National Defense and the Department of Emergency Management organized a special video conference on flood control to conduct a rolling study and judgment of the development trend of the flood situation, and guided the inspection and defense of the Liaohe River embankment, especially the breach and blocking of the embankment of the Raoyang River.

  The consultation pointed out that it is necessary to supervise and guide Liaoning Province to organize all forces, implement materials and equipment in accordance with the established emergency response plan for dangerous situations, and focus on the work of blocking the breach of the embankment of the Raoyang River, pumping and draining waterlogging, etc., and strengthening the management of the middle and lower reaches of the Liaohe River. The inspection and defense of the embankments of the main stream exceeding the police section, the frequency of inspections of important embankment sections and dangerous sections, and optimizing the dispatch of flood control projects to ensure the safety of the embankments of the main stream of the Liaohe River.

At the same time, pay close attention to the two rounds of rainfall in the next few days, be highly alert to possible risks such as floods in small and medium-sized rivers, mountain torrents, geological disasters and urban waterlogging, especially strengthen the inspection and management of tourist attractions and tourists, and promptly issue information to cultural and tourism departments and scenic spots. The early warning prompts that the closure should be closed firmly to ensure the safety of personnel.

  At present, the National Defense General Working Group led by Li Kungang, the chief engineer of the Emergency Management Department, continues to guide the flood control work on the front line in Liaoning.

The work of blocking the mouth of the Raoyang River and restoring the embankment is under intense preparation.

As of 8:00 on August 3, the General Office of National Defense and the Ministry of Emergency Management have dispatched 213 key rescue forces and 32 sets of equipment from the Natural Disaster Engineering Emergency Rescue Center to participate in the blockage of the breach.