“In the republic, all residential facilities with a degree of destruction of up to 30% will be restored by autumn - damage to the roof, glazing, minor damage to the contour of buildings or load-bearing structures,” the press service of the Ministry of Construction of the DPR quoted him as saying.

He also added that objects with the destruction of load-bearing structures, that is, the degree of destruction from 30% to 70%, will require a more thorough examination and work on the restoration of building structures.

Such recovery will take a longer period, it all depends on the amount of damage.

Yaroshevsky added that buildings that cannot be restored will be demolished.

Earlier, Russian Deputy Prime Minister Marat Khusnullin outlined preparations for the autumn-winter period and the restoration of residential and social infrastructure as the main tasks in Donbass.