China News Service, June 14. According to the website of the Ministry of Emergency Management, according to the forecast of the Meteorological Department, from June 14 to 23, the cumulative rainfall in most of Jiangnan, South China and the eastern part of the southwest region was 70-150 mm, and the local area exceeded 400 mm. mm.

The National Defense Agency continued to maintain a three-level emergency response to flood control.

  On June 14, Zhou Xuewen, Secretary-General of the National Defense General Administration, Deputy Minister of Emergency Management and Deputy Minister of Water Resources, presided over a video conference on flood control, and discussed with the China Meteorological Administration, the Ministry of Water Resources, and the Ministry of Natural Resources, and the video was connected to Fujian and Jiangxi. , Hunan, Guangdong, Guangxi, Yunnan and other places, the fire prevention and rescue corps, and the forest fire corps, further analyze and judge the current flood situation and development trend, and study and deploy heavy rainfall prevention and response work in key areas.

  The meeting pointed out that the new round of heavy rainfall and the previous period highly overlapped, the Xijiang Wuzhou hydrological station will continue to rise and exceed the warning level, dozens of small and medium rivers in the Pearl River Basin will have exceeded warning floods, and the risk of mountain torrent geological disasters in rainfall areas is very high. , the flood control situation is complicated and severe.

It is necessary to further compact the flood control responsibility, strictly implement the flood control responsibility system with the executive head responsibility system as the core, fully implement the five-level guarantee responsibility system, and especially strengthen the grassroots defense responsibility.

  The consultation emphasized that it is necessary to continue to strengthen monitoring and early warning and consultation and judgment, release early warning information and safety reminders in a timely manner, implement the "call response" mechanism for disaster early warning, improve emergency response in a timely manner, and make targeted arrangements.

It is necessary to make preparations for flood defense of major rivers in advance, pay close attention to the flood development trend of major rivers in the Pearl River Basin, scientifically schedule flood control projects, strengthen inspection and defense, refine rescue plans, prepare rescue materials, and pre-set rescue teams to detect signs of danger in a timely manner and quickly effective disposal.

It is necessary to strictly prevent mass deaths and injuries from mountain torrent geological disasters, give full play to the role of the mountain torrent geological disaster early warning system and the mass monitoring and mass prevention system, and decisively transfer the threatened people in advance.

It is necessary to strengthen the safety protection of reservoirs, especially small reservoirs and high-level weirs and ponds, implement the "three responsible persons" responsibilities, strengthen inspections, and promptly warn, transfer personnel, and respond to emergencies when dangerous situations are discovered.

It is necessary to do a good job in urban flood control and drainage work, strengthen the joint scheduling of urban flood control and drainage projects, strengthen management and control of low-lying urban flood-prone points, sunken interchanges, and underground spaces, and assign special personnel to be on duty. , and resolutely avoid casualties.

We must do our best to provide disaster relief and assistance to the affected people, grasp the disaster situation as soon as possible and report it in a timely manner, increase the investment of disaster relief funds and materials, properly arrange the basic life of the affected people, and attach great importance to health and epidemic prevention work.