China News Service, Zhengzhou, August 22 (Wang Dengfeng and Li Mingming) After the Henan Provincial Flood Control and Drought Relief Headquarters launched the second-level flood control emergency response, the officials and people of the province have "preempted" to actively respond to the upcoming heavy rainfall.

Since 0:00 on the 21st, some trains in Henan Province have been temporarily suspended, and some high-speed sections have adopted temporary control measures.

  The Henan Meteorological Bureau predicts that from the night of August 21st to the daytime of August 23rd, there will be a regional heavy rainfall process in Henan Province from west to east, with the highest local cumulative precipitation or 400 millimeters.

According to the relevant provisions of the "Henan Provincial Flood Control Emergency Plan", the Henan Provincial Flood Control and Drought Relief Headquarters decided to initiate a flood control level II emergency response at 12:00 on August 21.

  Temporary suspension of some trains and city buses

  In response to heavy rainfall, China Railway Zhengzhou Bureau and Henan Expressway Management Detachment have successively issued notices that some trains in the province will be temporarily suspended and some high-speed sections will be temporarily controlled.

  China Railway Zhengzhou Bureau stated in a notice that starting from 0:00 on August 22, 59 passenger trains will be suspended for one day.

Among them, there are 14 through-pass buses and 45 in-pipe buses.

For train outages, passengers who have purchased out-of-service trains can refund their tickets without handling fees.

At the same time, please remind passengers to arrange their travel reasonably and pay attention to the official website of 12306 and the announcement of the railway station in time.

  The Henan Expressway Management Brigade stated in a notice that from the night of August 21st to 22nd, due to the complicated road conditions in the Gongyi section of Lianhuo Expressway, the northern half of K621-K632 was changed from a single four-lane lane to a two-lane lane.

At the same time, drivers are reminded that the road section is not allowed to pass unless necessary, and timely control measures will be taken according to the weather conditions.

  After Henan launched the second-level flood control emergency response, it has not yet affected the flights at Zhengzhou Xinzheng International Airport.

At 21 o'clock on the 21st, the reporter called Zhengzhou Xinzheng International Airport. The customer service staff told reporters that all flights at Zhengzhou Xinzheng International Airport are normal.

If the flight information changes, please pay attention to the latest notice.

  Zhengzhou Public Transport Group decided to stop all public transportation lines in Zhengzhou from August 22 to 23.

The entrance to the underground garage of a community in Zhengzhou was tightly blocked with baffles and sandbags.

Photo by Li Guigang

  Send 7 flood prevention work steering groups

  After flood control emergency response was issued in many places, in order to actively respond to the new round of heavy rainfall that will appear from August 21 to 23, on August 21, the Henan Provincial Flood Control and Drought Relief Headquarters issued the No. 3 Commander's Order, demanding to do a good job. Emergency rescue work for flood prevention.

The directive requires strengthening consultation and early warning; repairing water-damaged projects; highlighting key prevention; organizing risk-avoidance transfers; strengthening on-duty duty; preset rescue forces.

  At the same time, on August 21, the Henan Provincial Flood Control and Drought Relief Headquarters dispatched flood control work steering groups to Zhengzhou, Kaifeng, Anyang, Hebi, Xinxiang, Jiaozuo and Jiyuan. Provincial Emergency Department, Provincial Natural Resources Department, Provincial Party Committee Organization Department, Provincial Commission for Discipline Inspection and other departments are composed of personnel.

  According to the requirements, the flood control work steering group will focus on the inspection of the Henan Provincial Party Committee, the Henan Provincial Government's work deployment, the requirements of the Henan Provincial Flood Control Video Conference and the implementation of the Henan Provincial Fangzhi No. 3 Commander's Order; the specific measures to transfer the masses before the rain; the reservoir The implementation of the "three responsible persons", the "three-level head of the tailing reservoir", flood control project inspection and investigation personnel; the pre-positioning of emergency rescue teams, the situation of flood control materials in the dangerous section of the dangerous work and the dangerous warehouse, etc.

  Stand up

  In Zhengzhou, the provincial capital, in order to avoid danger, a large number of private cars drove on both sides of the viaduct and the main streets of the city.

In this regard, the Zhengzhou Traffic Police Department stated that it will not penalize.

  At the entrance of the subway, at the tunnel, at the culvert, at the entrance of the community parking garage...flood prevention baffles, sandbags and other flood prevention materials are "waiting."

  In addition, the reporter learned that the Zhengzhou Municipal Pumping Station Monitoring Center has people on duty 24 hours a day, and 29 rainwater interchange pumping stations are also arranged with special personnel to ensure that the stagnant water under the bridge can be quickly drained. Ensure citizens' travel safety and smooth roads.

  When the depth of the stagnant water under the lowered bridge exceeds 20 cm, the bridge-closing instructions will be issued to the guards at various points. The guards will quickly pull the mobile hard isolation away to block pedestrians and vehicles from entering the bridge to ensure The safety of people’s lives and property.

  The reporter learned that the Huazhong Cardiovascular Hospital in Fuwai, which was severely affected by the "7.20" rainstorm, is currently conducting a 24-hour investigation. 300 water pumps, 20 generators, 10,000 sandbags, and 4 assault boats are ready for flood control. .

The First Affiliated Hospital of Zhengda University has also launched a flood prevention emergency plan. Each port is responsible for people and sufficient flood prevention materials. The sandbag flood prevention wall at the entrance of the underground garage has been built high. Sandbags have also been prepared at the entrance of the hospital and the lobby of the building. To prevent the risk of heavy rainfall.

(End)