BelTA informs about it.

"In accordance with the program of the stage of pilot industrial operation, the first power unit of the BelNPP is disconnected from the network for testing and routine maintenance," the ministry said.

Earlier it was reported that the loading of simulators of fuel assemblies into the reactor vessel began at the second unit of the Belarusian nuclear power plant.