China News Service Guiyang, June 30 (Reporter Liu Peng) The Guizhou Provincial Department of Water Resources issued the "Notice on Effectively Performing Heavy Rain Prevention" on the 30th, requiring water departments and related units at all levels to comply with flood and drought prevention level IV Emergency response requirements, conscientiously and detailedly handle all response work.

  According to the meteorological and hydrological forecast, under the common influence of cold and warm air, from July 1 to 3, Guizhou Province will continue to maintain heavy rainfall weather, and local rainfall in the western region can reach 200 mm. It is expected that the Chishui River, Wujiang River, and Qijiang River will see significant flooding, and large floods may occur in small and medium-sized rivers in the rainstorm area.

  This round of heavy rainfall process has a wide range of impact and great intensity. Guizhou officials requested to strengthen monitoring and early warning, closely monitor the development of rain, water and flood conditions, encrypt monitoring frequency, and strengthen monitoring, forecasting and early warning.

  Do a good job in the prevention of mountain flood disasters, focus on the rainy areas and the disaster areas in the early stage, make full use of the mountain flood disaster monitoring and early warning platform, and pass the early warning information to the responsible person and the people in the dangerous area in time through risk warnings and SMS warnings; , Land, tourism, transportation, education, and timely transfer of the affected people, so that they should make full turn, early turn and fast turn, and resolutely avoid mass deaths and injuries.

  Make every effort to ensure the safety of the reservoir and hydropower station during the flood season, urge the "three responsible persons" of the reservoir and hydropower station to take up their posts, perform their duties seriously, and strengthen the inspection of the duty of the patrolling dam. Number of inspections. Strengthen the scientific dispatch of reservoir hydropower stations, and it is strictly forbidden to operate the flood control level without permission.

  Strengthen the information reporting work, and earnestly report the flood disaster information during the heavy rainfall. Disasters and dangers should be reported as soon as possible. Discipline for flood control should be serious, and late reporting, omission and concealment are strictly prohibited. (Finish)