Typhoon No.15 Private Railway For a while from the first train, the operation stoppage is also 1:44 on September 9

With the approach of Typhoon No. 15, some private railways in the Tokyo metropolitan area have decided to stop driving for a while after the first train on the 9th.

According to Tokyo Metro ▽ Subway Tozai Line will stop driving from Toyocho and Nishifunabashi from the first train to around 10am.
▽ Subway Yurakucho Line will stop driving between Toyosu and Shinkiba from the first train to around 8am.
This means that the Fukutoshin Line may also be disrupted significantly.

On the Toei Subway, the Mita Line will be on the road between Hon Hasunuma and Nishitakashimadaira, and the Shinjuku Line will be on the road between Oshima and Motoyawata from the first train to 7am.
▽ Toden Arakawa Line and Nippori / Toneri Liner will stop driving on all lines from the first train to around 7am.

Tobu Railway ▽ Isesaki Line ▽ Nikko ▽ Noda Line ▽ Tojo Line will stop driving on all lines from the first train to around 6 am for safety confirmation.
After that, after confirming the weather conditions and safety, it is possible to continue the operation stop or reduce the number of driving significantly.
In addition, for express trains, the Nikko Line and Isesaki Line will be set off from the first train to around noon.

▽ Yurikamome will stop driving from the first train to around 8am.

▽ Tama Monorail plans to stop driving on both the upper and lower lines from the first train to around 8 am, and depending on the results of the safety check, there is a possibility that the start of operation may be delayed.

Other private railways may also postpone driving from the first depending on the weather conditions.

▽ Keikyu Electric Railway has the possibility of giving up driving on all lines from the first train to around 8am.

▽ Keio Electric Railway has decided to stop driving from the first train or reduce the number of driving, and is proceeding with consideration.

▽ Tokyu Corporation may stop driving from the first train and may significantly reduce the number of commuting hours, so it wants to make a final decision depending on the morning situation.

▽ Odakyu Electric Railway wants to start driving as soon as the wind and rain have settled and safety is confirmed.

▽ Seibu Railway is scheduled to drive from the first train, and depending on the weather conditions, there is a possibility of driving at a reduced speed or giving up on driving.