Share

10 August 201921.40 Demolition work on pile 2, the last remaining of the Morandi viaduct, began on the West side of the construction site of the new Genoa bridge. An excavator equipped with hydraulic clamps installed on a 30-meter-long arm began to demolish the pile near the Coronata hill in small pieces. The operation, the technicians explain, is delicate due to the presence of gas pipes and a decompression cabin. It will take a few days to complete the operation.