On August 12, at No. 59, Linhe Avenue, Longzhen Village, Longquan Town, Yiling District, Yichang City, Hubei Province, several maintenance personnel of the State Grid Yiling District Power Supply Company wore heavy insulating clothing and worked live for nearly 2 hours. Maintenance was carried out on the volt power line, and the transformer of the Yichang High-speed Railway Xincheng Office Building was successfully connected to the fire. At the same time, it ensured uninterrupted power supply for 1,590 villagers during the maintenance period, achieving "zero perception" and "zero impact".

On the same day, Hubei issued a high temperature red warning again, and the outdoor temperature in Yiling District of Yichang City exceeded 40 ℃ at 10 o'clock that day.

(Dong Xiaobin, Gao Yu Shi Mengqi produced by Dong Xiaobin)

Responsible editor: [Yue Chuan]