The JR Hachiko Line was suspended from the first train on the 13th on the upper and lower lines between Koraikawa Station and Ogawamachi Station in Saitama Prefecture due to the inspection of the track due to the influence of heavy rain, but it was midnight. Operation resumed in 42 minutes.
JR Hachiko Line Koraigawa Station-Ogawamachi Station Resumed operation
2022-07-13T04:12:08.260Z
[NHK] The JR Hachiko Line will be inspected due to heavy rain, so we will see the operation from the first train on the 13th on the up and down lines between Koraigawa Station and Ogawamachi Station in Saitama Prefecture.
Source: nhk