Wuhan Rail Transit Line 5, Line 6 Phase II, and Line 16 opened simultaneously on the morning of December 26.

  Wuhan Metro Line 5 is the first fully automatic driving line of Wuhan Metro. It adopts a domestic system with completely independent intellectual property rights. It can automatically complete remote wake-up, power-on self-inspection, departure and departure, opening and closing doors at the station, and unmanned turn-back. After operation, the fully automatic processes such as returning to the warehouse for sleep and automatic car washing have a higher degree of intelligence and stronger safety performance.

  Between the Metropolitan Industrial Park Station and Jianshe 11th Road Station, is the Depot of Workers' Village under the construction of the 11th Bureau of the Central Enterprise China Railway in Hubei Province.

It covers a total area of ​​315,000 square meters, with a total building area of ​​75,800 square meters, including 21 single buildings such as maintenance warehouse, application warehouse, operation complex, comprehensive building, and comprehensive maintenance workshop. It can be called Wuhan Metro No. 5 The "Train House" of the line.

Every day, the subway train is here to automatically wake up, "get up to work", and automatically return here after operation to complete the process of returning to the library, sleep, and automatic car washing, so as to achieve "shower rest".

  (Gu Jian Ao Yang Longfeng produced by Zou Hao)

Editor in charge: [Li Yuxin]