China News Service, Ningbo, July 26 (Reporter Lin Bo) On July 26, the reporter learned from the Flood Control Platform and Drought Relief Command Center in Haishu District, Ningbo City, Zhejiang Province. Water accumulating to varying degrees, 114 villages and 51 communities were flooded, and 1,353 enterprises were affected by the disaster.

Among them, Dongqiao Town has been flooded, involving 20 villages and 50,000 people.

  It is reported that as of 14:00 on the 26th, the average rainfall in Haishu District was 350.9 mm, with 8 stations exceeding 400 mm, and 4 stations exceeding 500 mm.

Water accumulated in Dongqiao Town.

Photo by Lin Bo

  In terms of storage capacity (water level), as of 14:00, in terms of plain river network water level, the water level of the plain river network control station (Huanggulin station) was 3.07 meters, the over-warning water level was 1.07 meters, and the over-guaranteed water level was 0.57 meters; the urban river network control station ( Beidouhe Station) The water level is 2.46 meters, the super-warning water level is 0.56 meters, and the super-guaranteed water level is 0.16 meters.

  In terms of water storage, the three large and medium-sized reservoirs including Zhougongzhai, Jiaokou, and Xixia have a total storage capacity of 217.94 million cubic meters, accounting for 117% of the total controlled storage capacity (185.77 million cubic meters). Small reservoirs (important) hold water. The amount of spillway overflow has generally appeared.

  As of 14:00 on the 26th, a total of 80,729 people had been transferred in Haishu District, and 28,534 people had been transferred from the evening of the 25th to 14:00 on the 26th.

228 resettlement sites at various levels were activated, and 33,219 people were resettled in a concentrated manner.

  At present, the whole area of ​​Dongqiao Town is serious, the entire Heliang line of Zhangshui Town is serious, and the whole area of ​​Yinjiang Town except the Hengyin line is serious. There is an unnamed road in Longguan Township that allows small vehicles to pass and large rescue vehicles. Impassable.

Water accumulated in Dongqiao Town.

Photo by Lin Bo

  In terms of rescue forces, from the evening of the 25th to 11:00 on the 26th, the Ministry of Armed Forces sent 120 new reinforcements, 12 firefighting teams with 357 reinforcements, 9 professional teams from the housing construction, transportation and other government departments, with 635 reinforcements, and 4 social forces. Support, 750 reinforcements.

(Finish)