China News Service, Nanjing, July 25 (Reporter Gu Hua) "Such a high tide reminds us to detect and prevent as early as possible, and to continuously inspect the levee for dangers, so as to detect small hidden dangers that endanger the safety of the levee in time and avoid the formation of major problems. Hidden danger.” On the 25th, Zhu Weiguo, deputy director of the dike gate management office of the Nantong Water Affairs Bureau, walked on the coastal dike to check the wind and waves.

  Nantong is a coastal city in eastern Jiangsu, close to the river and the sea.

Affected by the typhoon "fireworks", the city's wind and rain have increased markedly from the night of July 24, with showers in general in the city, with moderate to heavy rainfall in the central and southern parts of the city. A total of 81 stations in the city experienced strong winds of level 7 or above, including 35 at level 8, and 9 15 at level 10 and 4 at level 10 (all on the coast), with a maximum wind speed of 28.2 m/s.

  "Has the dilapidated houses in the village been fully evacuated? Have the transferred personnel been properly placed?" On the morning of the 25th, Ma Xin, Secretary of the Disciplinary Committee of Beixin Town, Qidong City, led a team to investigate flood control and anti-Taiwan in various villages on the morning of the 25th. Prompt problems immediately urge rectification in place.

The trees were blown down.

Photo courtesy of "Nantong Release"

  In the morning of the same day, the Zhongtian Green Fine Steel Project combined with Haimen Port New Area to urgently evacuate construction workers and relocate them to temporary settlements.

At present, more than 7,000 personnel from the Zhongtian project unit have been transferred.

  Starting at 9:30 on July 25, Nantong upgraded the city’s emergency response to typhoon "fireworks" from level III to level II.

The city’s coastal areas and rivers have been inspected for 24 hours. At the same time, various potential safety hazards have been investigated, all outdoor operations have been halted, and nearly 30,000 people have been transferred and resettled.

  It is understood that the city has also established 17 professional dyke inspection teams and 256 professional rescue and rescue teams to ensure that the problems found by the dyke inspection team are repaired in a timely manner, and more than 70 excavators and 18,000 tons of flood control are reserved. The defensive materials such as blocks should be placed reasonably and called at any time to ensure emergency rescue needs.

The police cleaned the fallen trees.

Photo courtesy of "Nantong Release"

  At 3:25 pm on the 25th, the 10kV Yuzha line in the Nantong Export-oriented Comprehensive Agricultural Development Zone suddenly suffered a power outage, affecting 3 villages in Huandong, Heya, and offshore, as well as the Liubu Sluice Management Office, which is draining waterlogging, and more than 30 enterprises State Grid Rudong County Power Supply Company Juzhen Power Supply Station immediately rushed to the scene to find the fault point and rushed to repair it. The power supply was restored at 5 pm and delivered power to more than 200 farmers in a timely manner.

  Strong winds and heavy rain caused trees to fall and break in many places in Nantong.

The city's multi-departmental cooperation has implemented the rescue team and material guarantee, and strictly implemented the 24-hour duty and leader-led system to ensure the first emergency response and the front-line command of the rescue work.

  In the face of the powerful typhoon "fireworks", Nantong City's urban management department went all out to do a good job in defense. As of 16:00 on the 25th, the city's urban management system dispatched a total of 1,760 emergency on-duty personnel and 2030 emergency rescue team personnel. (Finish)