China News Service, Taiyuan, July 22 (Gao Yuqing and Zhang Yilong) The reporter learned from the State Grid Shanxi Electric Power Company on the 22nd that in order to assist Zhengzhou, Henan Province in the rainstorm and flood-stricken areas, and spare no effort to ensure the local production and living power supply, the company urgently established the Taiyuan 11 power supply companies including Yuncheng, Linfen, Jincheng, Changzhi, Luliang, Jinzhong, Xinzhou, Datong, Shuozhou, Yangquan and other 11 power supply companies with the Communist Party member service teams as the main emergency repair team, the first batch of repair personnel and generator cars have been rushed on the 21st Zhengzhou.

The first batch of repair personnel and generator cars rushed to Zhengzhou on the 21st.

Photo courtesy of State Grid Shanxi Electric Power Company

  Since mid-to-late July, heavy rainfall has continued to occur in many parts of Henan, serious waterlogging has occurred in cities such as Zhengzhou, some rivers have over-alert water levels, some reservoirs have broken dams, some railways have been suspended, and flights have been cancelled, causing heavy casualties and property losses.

  After the disaster in Henan, the State Grid Corporation of China launched an emergency response and organized forces to quickly carry out emergency repairs.

The emergency repair personnel of the State Grid Shanxi Linfen Power Supply Company arrived in Henan.

Photo courtesy of State Grid Shanxi Electric Power Company

  It is reported that the emergency repair team of the State Grid Shanxi Electric Power Company has moved 7 500 kVA generator cars and 26 repair personnel on 21st, and another 4 small-capacity generator cars set off on the 22nd, and organized a repair team of more than 100 people on standby. repair.

(Finish)