According to JR East, the JR Chuo Line rapid train and JR Chuo / Sobu Line stations, which had been suspended due to electrical system troubles, have just resumed operation on all lines.

In addition, the JR Yamanote Line, JR Saikyo Line, JR Shonan-Shinjuku Line, and Sotetsu Line, which are operating directly to JR, are expected to resume operation at 9:30 pm.