[Explanation] In Pingbian County, Honghe Prefecture, Yunnan Province, there is a railway bridge spanning the cliffs-Wujiazhai Railway Bridge, which is also called the "human bridge" because it resembles the character "human".

The Herringbone Bridge is one of the landmark projects of the Yunnan-Vietnam Railway.

  [Explanation] The meter-gauge Yunnan-Vietnam Railway, which spans over a century, is still undertaking the task of international combined transport.

Recently, the Kaiyuan Engineering Section of China Railway Kunming Bureau Group Co., Ltd. combined with the equipment spring inspection and spring inspection, and organized maintenance personnel to conduct "consultation" on the miter bridge before the rainy season to eliminate hidden equipment hazards and ensure transportation safety.

  [Explanation] In the morning of the same day, the staff from the Wantang Bridge Tunnel Work Area of ​​the Kaiyuan Public Works Section came to the Miter Bridge to conduct a comprehensive overhaul of the bridge body and deck.

The bridge deck of the herringbone bridge is more than 100 meters away from the bottom of the valley. The terrain is steep. The maintenance is a high-altitude operation. Coupled with the spring wind and other factors, higher requirements are put forward for the operation standards.

  [Concurrent] Tao Xuegang, Director of Kaiyuan Bridge Road Workshop, Kaiyuan Engineering Section, China Railway Kunming Bureau Group Co., Ltd.

  We need to see (inspect) a few things, and also look at the bridge deck, (we) all have to inspect, especially the connecting rods, and see (inspection) to have a good idea, and let our equipment be before flood control. , And make preparations for flood control.

  [Explanation] After the roll call and division of labor, Tao Xuegang led his colleagues to clean up the pier supports of the herringbone bridge.

They climbed up the boom against the gale in the canyon, inspecting and removing rust on every bolt member on the boom and support of the herringbone bridge.

After the other employees fastened the safety rope, they moved forward with Tao Xuegang and others to protect the four people.

  [Concurrent] Tao Xuegang, Director of Kaiyuan Bridge Road Workshop, Kaiyuan Engineering Section, China Railway Kunming Bureau Group Co., Ltd.

  The first time I climbed this bridge, I just climbed here, my feet will be soft.

Especially in summer, because it is a hot place, the subtropical climate is very humid, and the sun grows moss. The rainy season is very humid, and people will slip on their feet when they go up.

Because it hasn't rained in the past two days and the fog is small, we can climb (safely).

In the usual rainy season, we have to watch the weather forecast, and we dare to climb by looking at the weather conditions of the next day (no rain).

  [Explanation] In accordance with the maintenance requirements, the work area shall inspect the bridge and tunnel in charge once a month.

Many people have stayed here for many years to ensure the normal operation of the Yunnan-Vietnam Railway for a century.

  [Concurrent period] Zheng Rongwei, deputy foreman of Wantang Bridge Tunnel, Kaiyuan Construction Section of China Railway Kunming Bureau Group Co., Ltd.

  As soon as the little girl played the video, she asked me when I could go home.

I always prevaricate her, I will go home after a good meal, and I will go home after a good sleep.

  Tang Xiaoyan, Su Rong, Zhu Shifu reports from Honghe, Yunnan

Editor in charge: [Li Yuxin]