Resumption of JR Sobu Main Line operation at 6:11 on July 6th

According to JR East, the Sobu Main Line had been suspended from operation between Naruto Station and Choshi Station in Chiba Prefecture due to the power outage, but resumed operation at around 11:00 am after the power outage was restored.