China News Service, Shaoxing, June 30 (Reporter Xiang Jing Hu Xufeng) Affected by strong precipitation echoes, from the early morning of June 30, a heavy rain stormed Xinchang County, Shaoxing City, Zhejiang Province. . Up to now, the county's traffic and road department has dispatched 180 vehicles, more than 300 people, patrolled more than 1,200 kilometers, and cleaned more than 1,800 cubic meters of collapse.

Clean up the pavement. Provided by Xinchang County Transportation Bureau

  At 5 o'clock on the 30th, the maintenance personnel successively discovered that the road section near the Yanzhou Village on the 104th line and the multiple sections of the Xinda Line on the county road were blocked due to the collapse of the upper slope, the pavement overflowing, and the collapse of the culvert. Sudden debris flow near Shijiakeng rushed to the pavement, causing traffic disruption; then, road traffic was interrupted in many sections of the provincial highway Jiangba line, county Daoliguan line, Xinhu line, and many dangerous situations occurred.

Clean up the pavement. Provided by Xinchang County Transportation Bureau

  The county's traffic and highway department dispatched maintenance personnel, road members, and emergency machinery to the scene to troubleshoot. As of 11 o'clock on the 30th, the amount of landslides caused by floods in the county reached 2,500 cubic meters. After emergency rescue by the transportation department, more than 1,800 cubic meters of landslides have been cleared.

Clean up the pavement. Provided by Xinchang County Transportation Bureau

  It is understood that in response to the hidden safety hazards of highway traffic caused by continued heavy rainfall in recent times, the Xinchang County Transportation and Highway Department has strengthened road network inspections, highlighted the two-way linkage mechanism for maintenance and road administration, and adopted the "full team members on duty, all-round inspection, and full route coverage". Way, pay close attention to road sections with high incidence of geological disasters, and at the same time prepare adequate rescue machinery and materials, and clean up side trenches and roadblocks in a timely manner. (Finish)