China News Agency, Guangzhou, June 8 (Guo Junfangjie) A reporter learned from the China Railway Guangzhou Bureau Group Co., Ltd. (hereinafter referred to as the "Guangtie Group") that in recent days, heavy rainfall has continued to occur in many places in Guangdong, the Pearl River and Sui Rivers, Xiaojin River, Qigong River, Shuibian River and other sections of the river exceed the warning water level, the Beijing-Guangzhou, Beijing-Kowloon Railway main line and Beijing-Guangzhou, Guiguang and other high-speed rail main lines have rainfall exceeding the warning level. As a result, some trains passing through the above lines have been delayed to varying degrees. The Guangzhou Railway Group launched the emergency plan as soon as possible, fully responded to the rainstorm weather, strengthened the line inspection, and vigorously rectified the hidden dangers to ensure the safe and smooth flow of railway transportation.

  At present, the Guangzhou Railway Group has carried out a macro picture analysis of the surrounding environment of all 1704 flood control points in the pipe, and is conducting a comprehensive inspection of the mortar block stone retaining wall with a height of more than 3 meters by means of inspection, drilling and coring, and geological radar. . At the same time, it carried out key line inspection and rectification work such as inspection and detection of protection facilities, geological investigation of high dikes and deep cuts, and tunnel disease rectification, and formulated measures for rectification of the problems found in the rectification period.

  "We take the initiative to contact the local water conservancy and meteorological departments every day to dynamically analyze the rain and wind conditions and the use of rivers, reservoirs, and canals around the railway, timely forecast and warn, and strictly conduct rain and post-rain inspections, key point guards, and additional inspections. Wait for work." Wang Xin, director of the dispatching office of the Guangzhou South High-speed Railway Engineering Section, said.

  According to the work department of the Guangzhou Railway Group, in order to ensure that the flood prevention is foolproof, the Guangzhou Railway Group adheres to the flood control of all staff, strengthens the duty on duty, arranges the group and station and package maintenance cadres to supervise and implement the flood prevention point in advance, strengthens the inspection of the locomotive, and strengthens the rain The frequency of inspections is to ensure that there are no omissions, dead spots and full coverage in flood control inspections.

  According to the forecast, the rain in Guangdong will remain very strong in the next few days. On the 9th, there were heavy rains in northern Guangdong, western Guangdong, and the central and northern parts of the Pearl River Delta, which mainly affected the Beijing-Guangzhou and Beijing-Kowloon railways and the Beijing-Guangzhou and Guangzhou-Shenzhen-Hong Kong high-speed rail lines. On the 10th, there were heavy rains or heavy rains in northern Guangdong and the Pearl River Delta, which mainly affected the Beijing-Guangzhou railway and Beijing-Guangzhou high-speed railway. The Guangzhou Railway Group is standing by and is arranging personnel to be stationed and deployed in key flood control areas 24 hours a day. (Finish)