JR Mizugun Line Damage caused by bridges and railroad tracks Fukushima Asakawa-cho Oct. 13 20:13

In Asakawa-cho, Fukushima Prefecture, damage has been caused by rivers with increased flooding of bridges and tracks near Satoshiroishi Station on the JR Mizugun Line.

In Asakawa-machi, Fukushima Prefecture, the JR Mizugun Line bridge over the Shari River flowing near Satoshiroishi Station was caught in the water due to the increase of the river due to the typhoon rain, and part of it was washed away.

The bridge girder of the remaining bridge is entangled with a lot of grass and trees that have been washed away, and the tracks and paving stones that continue from the bridge are not broken.

The remaining tracks are also greatly distorted and trees have fallen.

According to the JR East Mito branch office, the Mizugun line cannot be operated and there is no prospect of resumption.