“Approve and put into effect from September 1, 2022 the set of rules “Hinged facade systems with an air gap.

Ensuring fire safety during installation, operation and repair, ”TASS quotes the text of the document.

The order provides for safety rules for the installation, operation and repair of facade systems.

The document also contains a list of requirements for building materials that are part of the structures of facade systems. 

Earlier, one of the employees of the Grand Setun Plaza Moscow business center spoke about how the building was evacuated at the beginning of the fire.

In half an hour, the facade of the business center building was completely burned out.