On July 6, the construction personnel of China Railway Electrification Bureau re-examined the first project of the Lalin railway contact network. On the same day, the first project of the contact network of the Lhasa-Linzhi section of the Sichuan-Tibet Railway (referred to as the "Lalin Railway") was successfully completed in the area between Zhabang and Zhaqi, Shannan City, Tibet, which established the specifications and standards for the construction of the entire line. It has also entered the stage of large-scale construction of electrification across the board. The length of the main line of Lalin Railway is 435.48 kilometers, which is the first electrified railway in Tibet. A total of 540.63 kilometers of catenary network and a design speed of 160 kilometers per hour are required on the main line. China News Service reporter He Penglei

Release time: 2020-07-06 21:38:52 [Editor: Li Jun]