On August 25, the freight shuttle bus (Kunming to and from Vientiane) of the China-Laos International Logistics Channel departed smoothly.

After leaving Kunming, Yunnan, the shuttle bus will depart through Mohan Port to Vientiane, Laos.

  The China-Laos cross-border freight shuttle bus runs at the same time. The shuttle bus from Kunming is fully loaded with machinery and equipment, polyethylene pipes, cartons and other goods with a total value of about 3 million yuan (RMB, the same below), as well as cross-border e-commerce across the country. product.

At the same time, a freight shuttle carrying Lao specialty commodities such as iron ore, cassava flour, rubber, etc., with a total value of about 1 million yuan, has departed from Vientiane and arrived at Mohan Port. The goods will be distributed to all parts of the country after they arrive in Kunming.

  Located in the southwestern border of China, Yunnan Province is the radiant center of China facing South Asia and Southeast Asia. It borders Laos. After the opening of the China-Laos Railway at the end of 2021, Kunming and Vientiane will arrive in the morning.

  The freight shuttle is a trial operation with cargo, which is a test and preview for the assembly of international freight trains and logistics trade in China-Laos Corridor, laying the foundation for the smooth opening of international freight trains and smooth trade of China-Laos Railway at the end of the year.

  At the departure ceremony, relevant companies signed the "China-Laos International Logistics Channel Cross-border Transport Capacity Strategic Alliance Cooperation Agreement" and the "China-Laos International Logistics Channel Cross-border Financial Strategic Cooperation Agreement".

(Reporter Luo Jie produced Lu Huiqian)

Editor in charge: [Tian Boqun]