China News Service, Beijing, December 21 (Reporter Zhou Yin) China National Railway Group Co., Ltd. disclosed that starting from 0:00 on January 20, 2021, the national railways will implement a new train operation map, adding 325 passenger trains, mainly 114 freight trains were added to the freight channel.

After the map adjustment, the total number of passenger and freight trains in the country reached 10,203 and 20,513 respectively, and the railway passenger and freight transportation capacity was further improved.

  After the map adjustment, passenger train tickets will be sold on December 22.

  According to the person in charge of the Transportation Department of China National Railway Group, the adjustment of the map is an optimization and adjustment of the transportation organization plan by considering the commissioning of new railway lines at the end of 2020 and early 2021, the expansion of capacity resources, and epidemic prevention and control. Four changes.

  One is to make full use of new line resources to enhance regional transportation capacity.

At the end of 2020 and early 2021, many new railway lines will be put into operation.

In this map adjustment, the railway department made full use of the resources of the new line to arrange the operation of high-speed rail, normal speed and freight trains to enhance regional transportation capacity.

For example, the Lianyungang-Zhenjiang high-speed rail has been opened. After the map is adjusted, up to 124 mobile trains will be operated daily, realizing the seamless connection between northern Jiangsu and central Jiangsu and the central city of the Yangtze River Delta. The fastest way from Lianyungang to Zhenjiang is 2 hours9 Sub-reachable; Xinjiang Beijiang Railway Ring Line and Geku Railway, which have been fully operational, have 6 passenger trains and 10 freight trains every day after map adjustment. This has ended the history of non-railway access in parts of southern and northern Xinjiang. Improve the transportation capacity of Xinjiang railway.

  The second is to optimize the train operation plan to meet the needs of passengers.

According to the changes in passenger flow, the railway department has precisely formulated passenger car operation plans on high-speed rail and normal-speed lines, adding 88 daily EMU trains and 2 weekend lines, changing 44 operating sections, and adjusting operating routes 29 Column.

  The third is to enhance cargo transportation capacity and help the new development pattern.

In accordance with the transportation needs of key materials such as coal and grain, 114 freight trains will be added to the main freight channels of Beijing-Harbin, Jinshan, Shenshan, Yuhuai, Jiaoliu, and Xiangyu.

Focusing on the changes in the demand for China-Europe freight trains and the new western land-sea corridors, we will optimize the operation of freight trains. After the map adjustment, 73 China-Europe freight trains, 30 Central Asian freight trains, 6 land-sea new trains, and 11 riverside trains provide precise services. The construction of the Belt and Road Initiative and the development of China's foreign trade.

  The fourth is to coordinate epidemic prevention and control and transportation organization, so that passengers can travel safely and at ease.

(Finish)