On March 30, the newly-built Guiyang hub Xiaobi via Qingzhen East to Baiyun North Link (hereinafter referred to as "Guiyang Ring Line Xiaobi to Baiyun North Section") was officially put into operation, marking the opening of the entire Guiyang Ring Railway and Guiyang entering the Urban Ring Railway Times, the fastest lap around the city is 1 hour and 26 minutes.
The 17 stations of the ring line connect the surrounding scenery of Guiyang in series. Public transportation is arranged along the line according to the concept of "zero transfer", creating an integrated transportation transfer system.
As the first express railway around the city in Guizhou, the Guiyang Ring Railway has a total length of about 113 kilometers. This time, the Xiaobi-Baiyun North Section of the Guiyang Ring Line has a total length of about 83 kilometers.
(Reporter Qu Honglun produced Lu Huiqian)
Responsible editor: [Cheng Chunyu]