Zhongxin Finance, January 10th. According to the official website of the National Development and Reform Commission on the 10th, the "Special Administrative Measures for the Inspection of Infrastructure Construction at National Opening-up Ports" (hereinafter referred to as the "Administrative Measures") will be implemented from the date of issuance and will be valid for 5 years.

  The "Administrative Measures" stipulate that the construction of port infrastructure should follow the principles of scientific planning and overall planning.

Specific construction projects should be based on the requirements of "single window" and shared use, coordinate the needs of each inspection unit, make full use of the original facilities, make scientific planning and rational layout, carry forward the fine style of hard work, diligence and thrift, adhere to a tight life, and avoid corruption Big search, duplication and waste.

  The "Administrative Measures" stipulate that the inspection infrastructure of different institutions and the same institution with different functions should be reasonably arranged and constructed in a coordinated manner to save the construction scale.

The infrastructure construction requirements for port public health core capacity building and animal and plant quarantine capacity building are in line with the "Standard", and the same standard is achieved.

It is strictly forbidden to illegally build office buildings and other buildings for party and government organs in the name of building port inspection infrastructure.

(Finish)