At 17:18 on December 20th, two sets of CR300BF-type Fuxing EMU trains after a long journey slowly drove into the Yinchuan EMU Operation Station of Lanzhou Depot of China Railway Lanzhou Bureau Group Co., Ltd. After maintenance, they will be in Yinchuan. The West High Speed ​​Rail is conducting a trial operation test.

After the opening of the Yinxi High Speed ​​Rail, it will take on the passenger transportation task of this line.

  The CR300BF Fuxing EMU has a designed maximum operating speed of 250km/h, a total train length of 208.95 meters, a maximum body width of 3.36 meters, a maximum height of 4.05 meters, and a total train weight of 431.3 tons. The body material is aluminum alloy.

The painting continues the "Golden Phoenix" design concept of Fuxing, with two golden ribbons running through the whole car, and the phoenix eyes on the head show the car's cleverness and vividness. The gold and "sea and sky blue" background colors are in harmony, and the undercarriage is dark gray. Calm atmosphere.

Because the body is painted in "sea and sky blue", this model is also called "blue warm man".

(Gao Zhiying and Xue Rui)

Editor in charge: 【Luo Pan】