China News Service Jinan, April 8th (Sha Jianlong) A reporter learned from the China Railway Jinan Bureau on the 8th that from April 10th, 2020, the national railway will implement a new train operation map. In this adjustment chart, the Shandong high-speed railway circular train first entered Qingdao Station, the "Net Red Slow Train" was upgraded and upgraded, and new capacity was added to the southwestern area of ​​Shandong. The total number of trains in Xintu Jinan Bureau will reach 442.5 pairs.

Data map: Passengers read from Zibo to Taishan 7053/7054 green leather trains. Photo by Sha Jianlong

To meet the diversified travel needs of passengers, the Jinan Bureau Group Company increased investment in improving station service equipment and facilities, upgraded the public service "slow train" from Zibo to Taishan 7053/7054 to a new air-conditioned vehicle, and compressed the round-trip travel time by 34 minutes. In order to allow more passengers to experience this "net red slow train", Xintu will arrange for a pair of Jinan-Zibo K8279 / K8280 express passenger trains. The train will depart from Jinan Station at 5:53 and arrive at Zibo Station at 7:08. Passengers who purchase a joint ticket can continue to take the 7053 train without getting off the bus. After driving at Zibo Station at 7:19, they can enjoy the scenery of the mountains and countryside along the "Nostalgic Slow Train" and experience the beauty of the food along the route. The "journey into the mountains" that Jinan tourists can travel to and from that day expanded to the mountainous area of ​​Luzhong.

Data map: After the 7053/7054 green leather train arrived at Zibo Station, the passengers dispersed and the train conductor was still solving problems for the passengers who came to consult. Photo by Sha Jianlong

In order to increase the connection between the cities along the Shandong Ring High Speed ​​Rail, the new plan optimizes the adjustment of the circular trains, and arranges the G5535 / 8/5 and G5536 / 7/6 trains from Linyi North to Linyi North from Qingdao North Station to Qingdao Station. , Shandong High-speed Railway Ring Train first entered Qingdao Station. Add 1 pair of G5563 / G5564 trains from Jinan West to Qufu East on the Shandong Ring High-speed Railway Line, add G9217 / 6G9215 / 8 times from Jinan West to Linyi North on the peak line, and G9328 / 9 and G9330 / 27 times from Qufu East to Weihai. From Jinan East (Jinan West) to Qingdao North D9434 / 1, D9432 times 1 pair, Qingdao North to Qufu East G9221 / G9222 times, G9331 / G9332 times 2 pairs.

Data map: On November 26, 2019, the Rizhao to Lankao high-speed railway Rizhao to Qufu section (referred to as "Rilan High Speed ​​Rail Riqu Section") was formally put into operation, and the high-speed rail in Shandong Province achieved circular connectivity. Passengers take pictures in front of the car. Photo by Sha Jianlong

By extending train operation sections and changing the starting and ending stations, Jinan Bureau maximizes the balance of passenger transport capacity in key hubs in Shandong Province. From Qingdao to Beijing South, the G178 / G185 operation was changed to economic green high-speed rail; Weihai to Yancheng D1696 / 7, D1698 / 5 times were extended to Rongcheng; Weihai to Jinan West D9464 times were extended to Jinan East terminal and changed to D9464 / 5 times; From Yantai to Qingdao North, the C6580 / C6579 trains were changed to C6520 / 17, C6518 / 9, and then changed to the end of Qingdao Station; the train from Jinan East to Qingdao North D6018 / 5, and the train from Qingdao North to Jinan D6026 changed to Qingdao Station End to start.

In addition, in order to meet the travel needs of passengers in southwestern Shandong, Xintu added a pair of Qingdao-Heze K8318 / 5 and K8316 / 7 express passenger trains, and expanded the train compartments of Jinan-Heze T7576 ​​/ 7 and T7578 / 5 by 8 vehicles Up to 12 vehicles, an increase of 382 seats, enhance passenger transport capacity between Heze, Liaocheng and other cities and cities in Shandong Province. (Finish)