"Implement your school project with the best materials and the lowest costs", a slogan that is presented by the majority of libraries; to exploit the assignments of teachers to the students repeatedly design and implement models that reflect the student's understanding of the lessons prescribed in some materials, or show his talent in imagination and creativity, within the school activities prescribed in the curriculum.

According to students of Emirates Today, schools are aware of the students' purchase of the projects ready, pointing to their annoyance and harm from these activities, especially as it requires them to waste money useless, pointing out that it does not increase the skills of students; The Ministry of Education implements all activities within the school.

In addition, the price of the models of the science day and the national day ranged between 15 and 50 dirhams, while the prices of the models of science and history were up to 300 dirhams , While projects that are tailored to specific requests go beyond these amounts. The schools insist on the request and implementation of these activities, although the main purpose is missing, especially since they are aware that the students are buying their projects ready from the libraries, in addition to the projects that provide repeated copies.

"Ready-made projects have become an item to be put into the family budget, in addition to the cost of study. The schools are keen to assign students to each semester to demonstrate their interest in activities," said Hazim Eid, a fifth- and ninth-grader. In the school that students buy these models from libraries scattered around schools ».

He added: "My young son was assigned to a circular work of the Sheikh Zayed Bridge, while the eldest son was asked to design an environmentally friendly farm." The first project cost 120 dirhams, the farm price was 200 dirhams, and 25 dirhams per air mill Stereotype ».

The student's sixth grade mother, Najla Saleh, said: "It is supposed to guide the student to practice the activity that suits him, and commensurate with his wishes and talents, but the obligation of students to carry out the same activity eliminates the primary objective of school activities, and drives students to aversion to them, The grade parameter is not satisfied with the activity, but requires it as a requirement of the study plan.

The mother of three students in the second and third seminars (Umm Saud) pointed out that the activities and the ready-made models are a commodity that everyone is dealing with, especially since buying them is cheaper than manufacturing them, because they consume a lot of time in their industry and often fail and waste manufacturing materials without interest. That the majority of students are also seeking to buy because of the students' boasting of the best designs. "

Students are justified in buying their projects because they are unable to implement them because they do not receive school training, which means that they are the ones who will make them, so there is no difference between their manufacturing at home or purchasing them ready, as long as the student does not design or implement them themselves, With many complaints to the educational authorities responsible to prevent such requests, and obligate schools to implement projects within them, under the supervision of teachers, because the tuition fees include covering the costs of these activities.

On the other hand, the Ministry of Education called on the school administrations to direct the teaching staff to implement all activities within the school and the classroom, not to transfer them to non-residential activities, or to assign students to implement them externally, stressing that this burdens the parents. It also stressed the need not to accept any project carried out outside the school, and not to calculate the degrees of such projects and activities.

3 dirhams per centimeter

Library workers confirmed that the implementation of school projects and activities for students is an essential part of their activities. Students are accepted to the library during the last month of each semester to purchase ready-made projects, whether they are models or plates, or the project plan for processing and execution.

The activities are divided into two parts, one for national and religious events and the other for educational projects. The prices vary in size, height and number of elements within it, pointing out that the specially manufactured body is measured by centimeters in length and width, where the centimeter is calculated at three dirhams. For example, if the length of the object is 30 centimeters and 20 centimeters wide, the price is 180 dirhams, then the prices of the models within it will be added, and will vary in size and time of implementation.

• Students: Student projects are identical and schools are known to be ready.

• AED 300 price of materials of science and history.