Recently, on the Nanbinhe Road near the water square near the Zhongshan Bridge, the staff and cleaners in the Yellow River Scenic Area are busy. Mechanical dredging, water flushing, and manual garbage picking are carried out in an orderly manner. The finishing work of the Yellow River style line dredging.

  The flood season of the Yellow River in 2020 starts at the end of June and lasts nearly 80 days. The flood season lasts for a long time and the river channel has a large amount of sedimentation.

The square near the water in front of you was once flooded in a large area, and only the roof of the house was visible when the water level was highest.

  In this dredging work, the large scenic area has dispatched 3,000 dredgers and more than 40 various types of mechanical vehicles to clean up about 30,000 cubic meters of silt and about 15 tons of garbage.

  Today, Fengqing Online Park has reopened. Long-lost water projects such as sheepskin rafts and speedboats have also reopened to welcome guests. Tea stalls on the side of the Yellow River to enjoy the scenery and drink tea, etc., are grasping the wave of "Yellow River economy".

Editor in charge: [Tang Weijie]