Road construction and transportation team members break through Bei'ao Natural Insurance

  2020 Everest surveying mountaineering activities Road construction transportation team members broke through the North Col natural risk on the 10th and are expected to repair the summit route on the 12th. According to the second fall of the captain of the Everest Survey Mountaineering Team in 2020, according to the plan, the road repairing team will lay the rope to an altitude of about 8,600 meters on May 11 and return to the assault camp at an altitude of 8,300 meters. On the 12th, weather permitting, road construction team will repair the peak route. (Reporters Wei Yukun, Wu Siyu, Wang Qinou)