China News Service, Shenzhen, April 9 (Chen Wen, Zhu Zuying) The Shenzhen Metro announced on the 9th that due to the construction of the Shenzhen Metro Line 14 passing through the existing subway line 2 Gangxia to Huaqiang North, it encountered geological mutations, plus In the continuous rainy weather, Shenzhen Metro needs to temporarily reinforce the Gangxia North to Huaqiang North Line 2. Affected by this, the subway line 2 from Futian Station to Xinxiu Station was temporarily suspended, and bus connections were opened. While Chiwan Station to Futian Station maintain operation in both directions, the interval between trains has increased compared with normal days.

It is reported that as of the evening peak period, Metro Line 2 is still temporarily unable to resume normal operations, passengers need to choose other normally operating lines or use other transportation to travel. (Finish)