On April 8th, in the Wuhan EMU, the train stopped on the storage line and was ready for operation (photo of drone). On the same day, Wuhan officially lifted the control measures for the passage from Han to Hubei. Dozens of EMUs were repaired and eliminated in the Wuhan EMU, just like the "land fleet" docked on the storage line, ready to go and restarted. Xinhua News Agency reporter Xiao Yijiu photo source: Xinhua Net

Release time: 2020-04-08 10:58:50 [Editor: Zhai Lu]